Hilton Hotel By Hampton

END CLIENT: Hilton by Hampton
PROJECT:  Full M&E installation
DEVELOPER: Nightel

When the famous Hilton brand signed a deal with developer Nightel to construct a 100 bed Hampton hotel at Humberside airport, N&P group were successful in winning the tender for Full M&E installation to Hilton’s brand standards for this project.

This 7 million pound project included:

  • Hilton’s 1st use of Mitsubishi’s Hybrid air to water based VRF air-conditioning  system to all areas inc guest bedrooms
  • Full Heat recovery ventilation system
  • Full electrical system inc all LED lighting system
  • Plumbing system and hot water to serve 100 bedrooms

 

Paul Green owner of Nightel, the developer stated “N&P Group were excellent throughout the process of design / build and handover, Not only did they do a fantastic job they brought the full M&E under budget.

N&P Group are now successfully registered on the supply chain for the Hilton Group.

BP International | Servaccomm

 

END CLIENT: BP International (Sunbury on Thames)
PROJECT:  New Modular offices
REQUIREMENTS: Full Mechanical & Electrical Installation
CONTRACTOR: Servaccomm

Following receipt of a prestigious order for 32,500ft of Office accommodation from BP Sunbury, Servaccomm recognised that they required a Mechanical and Electrical contractor who could provide a high quality service within a tight time frame and who could provide the design and install the full M&E package.

N&P were able to respond quickly to this challenge and completed the project within a 40 week time frame ahead of schedule.
This prestigious project was designed and installed to meet the latest government guidelines on conservation of fuel and power to include:

 

  • LG3 lighting and occupancy sensing
  • Emergency lighting
  • Small power
  • Air conditioning and full vent heat recovery system to all areas
  • Server room with full UPS system and close control system
  • 18KW PV system
  • Addressable fire alarm system
  • Full distribution system including the supply to the building
  • Access Control

Holt School | MPH Building Systems

 

END CLIENT: Holt School
PROJECT:  New Classroom Block
CONTRACTOR: MPH Building Systems

Following the acceptance of an order for a 10 Classroom Two Storey Teaching Block; MPH Building Systems recognised they would need an esteemed Mechanical and Electrical Contractor to complete the work to the highest of standards and to a tight time frame and budget.

N and P secured the contract and soon rose to the challenge with the project being completed to the specification required by the client, as well as being in line with all current building regulations and government guidelines on energy efficiency and conservation of fuel.

N and P were able to manage both factory and site work effectively, in order to finish the project; not only ahead of schedule, but to their usual high standards. The success of the installation was a direct outcome of our vast experience and intrinsic knowledge of the building industry. The project was highly successful for N and P Climate Control, with the team understanding what was required of them, and surpassing all expectations.

  • Electrical 80%
  • Climate Control 79%
  • Plumbing 75%
  • Security 60%

Lets work together

N&P have a team of dedicated project estimators on hand to deal with your enquiries. Feel free to contact us anytime.

Interested In Working With Us?