END CLIENT: BP Sunbury
PROJECT:  New Modular offices
REQUIREMENTS: Full Mechanical & Electrical Installation
CONTRACTOR: Servaccomm

Following receipt of a prestigious order for 32,500ft of Office accommodation from BP Sunbury, Servaccomm recognised that they required a Mechanical and Electrical contractor who could provide a high quality service within a tight time frame and who could provide the design and install the full M&E package.

N&P were able to respond quickly to this challenge and completed the project within a 40 week time frame ahead of schedule. This prestigious project was designed and installed to meet the latest government guidelines on conservation of fuel and power to include:

 

  • LG3 lighting and occupancy sensing
  • Emergency lighting
  • Small power
  • Air conditioning and full vent heat recovery system to all areas
  • Server room with full UPS system and Close control system
  • 18KW PV system
  • Addressable fire alarm system
  • Full distribution system including the supply to the building